Carbon neutralization industry performance

Serial Number

Project name

Scope of work

1

50000 m3 natural gas CO2 removal device of a company in Taihu Lake

Simulation calculation, tower internals selection, tower hydraulics design

2

100000 m3 natural gas CO2 removal unit of a company in Taihu Lake

Simulation calculation, tower internals selection, tower hydraulics design

3

2million m3 natural gas CO2 removal device of a company in Taihu Lake

Simulation calculation, tower internals selection, tower hydraulics design

4

30000 m3 / D LNG plant of a company

Design general contracting

5

30000 m3 / D LNG plant in Inner Mongolia 

3D Piping cutting package

6

Danba 60000m3 / D LNG treatment

Process package + construction drawing design

7

210000 m3 / D LNG treatment in Zhidan Park

Process package + construction drawing design

8

Comprehensive utilization of CO2 removal from blast furnace gas in Xinjiang Bayi Iron and Steel Co., Ltd

Construction drawing design

9

290000 m3 coke oven gas purification (deep CO2 removal) of a company in Inner Mongolia

Process package design

10

Syngas purification (deep CO2 removal) of ethylene glycol unit of a company in Inner Mongolia

Process package design

11

36000 m3 LNG of a company in Gansu

Process package + engineering design

12

30000 m3 LNG of a company

Process package + engineering design

13

Technical transformation of deep CO2 removal in 13-2 gas field of a company

Process package + amine solution + tower internals

14

Design of 60000 m3 / LNG in Yixi ditch

engineering design

15

Yangjiayu 60000 m3 oxygen /lng design

engineering design

16

Comprehensive utilization of CO2 removal from 1.2 million m3 coke oven gas in Jinmenkou

Process package + internals + amine solution

17

Carbon neutralization 1wm unit of environmental protection ship flue gas of a company in Jiangsu

Process package + construction drawing + amine solution + internals

18

30000 T / a industrial grade + food grade CO2 device of a company in Qingyang

Process package + construction drawing +epc

19

2million LNG CO2 removal system of a company in Qingyang

Process package + construction drawing +epc

20

Desulfurization and decarbonization of 600000 m3 / h blast furnace gas in Handan Iron and steel plant

Process package + amine solution


CONTACT US

Our company is a company to provide high value-added engineering technology solutions as the core of the engineering company. The company according to customer demand, to provide high-quality solutions and complete the full professional design, including technology, equipment, piping, instrumentation, electrical and water supply and drainage.